Surface Preparation: laminate flooring
Cleaned the subfloor of any debris and ensured it was dust-free.
Checked the surface for evenness and leveled minor irregularities.
Underlayment Installation:
Laid down underlayment for improved sound insulation and cushioning.
Laminate Flooring Installation:
Started laying from the corner nearest to the entrance for easier access.
Installed laminate planks along the longest wall, beginning with the first row and using a click-lock system for connection.
Periodically used expansion spacers to maintain the necessary expansion gap along the walls.
Cutting and Installing Subsequent Rows:
Used trimmed planks to offset joints and achieve a natural appearance.
Trimmed laminate planks precisely as needed to close long seams.
Finishing the Installation:
Fitted the final rows of laminate to match the room's dimensions.
Installed baseboards to cover the expansion gaps along the walls.
Completion of Work:
Cleaned the installation area of debris and waste.
Inspected the installation for any problematic areas and made adjustments as necessary. laminate flooring
Comments